Double Channel Loop Vehicle Detector Installation Loop Detector Vehicle For Sale

Double Channel Loop Vehicle Detector Installation Loop Detector Vehicle For Sale

Product Details
Brand Noble
Serial Number LD 200
Country of Origin Guangdong China
Certificate CE
Payment & Shipping Terms
Price Quote USD59
Minimum Order 5 Piece
Average Delivery Time After receiving payment 3-5 working day
Payment Method T/T ,Western Union, In cash
Package Details Carton 50pc one carton size 47*30*35cm weight 13.8kg
Ability to Supply 3000 pc /month

Double Channel Loop Vehicle Detector Installation Instructions

Preparation and Pattern Cutting:

  1. Before installation, cut the floor pattern for the Double Loop Vehicle Detector coil. Avoid cutting right angles, as they can damage the wire.
  2. Refer to the installation manual provided by our company for detailed requirements.

Cable Specifications:

  • Use a multi-core cable larger than 1.0mm² for installation and operation.

Coil Dimensions and Turns:

  • Rectangular Pattern:

    • Length: 1.0m to 2.0m
    • Width: 0.8m to 1.2m
  • Coil Length and Turns:

    • Coil Length: 3-4m, Turns: 6
    • Coil Length: 4-6m, Turns: 5
    • Coil Length: 6-10m, Turns: 4
    • Coil Length: 10-20m, Turns: 3
    • Coil Length: 20m+, Turns: 2

Coil Installation:

  1. Ensure each coil has an excess wire (residual line) to be connected to the detector with approximately 15mm of twisting.
  2. More windings result in lower frequency and weaker signals, while fewer windings produce higher frequency and stronger signals. Therefore, balance the number of windings to achieve optimal performance.
  3. Avoid placing coils near sources of interference such as adjacent winding doors or other signal-emitting devices to ensure proper functioning.

Positioning:

  • Install and embed the coils in locations free from potential signal interference to maintain the operational integrity of the system.

These guidelines will help ensure that your two-way loop vehicle detector is installed correctly and functions effectively. For comprehensive details, please refer to the installation manual provided by our company.

 

 

Troubleshooting Double Channel Loop Vehicle Detector Installation

If the Double Loop Vehicle Detector does not function properly after installation, please follow these steps to diagnose and resolve the issue:

  1. Reset the Detection Host:

    • Press the RESET button to reset the detection system.
  2. Check the Power LED:

    • Observe the POWER red LED.
    • If the LED is not lit, inspect the external power connections and the internal fuse.
  3. Check the CH1/CH2 LEDs:

    • If the CH1/CH2 green LED flashes:
      • Short Circuit: The coil circuit may be short-circuited.
      • Insufficient Coil Turns: If the flashing is slow, the number of coil turns is too low.
      • Excessive Coil Turns: If the flashing is rapid, the number of coil turns is too high.
  4. Adjust the Frequency:

    • High Frequency (Insufficient Coil Turns):
      • Change the frequency selection switch to LOW.
      • If the frequency remains too high, increase the number of coil turns.
    • Low Frequency (Excessive Coil Turns):
      • Change the frequency selection switch to HI.
      • If the frequency remains too low, decrease the number of coil turns.
  5. Long Flashing Interval:

    • If the green LED flashes once for a long duration, there is a failure in the previous circuit.

By following these steps, you can systematically identify and rectify issues with the Double Channel Loop Vehicle Detector, ensuring it operates correctly. If the problem persists after performing these checks, please consult the detailed troubleshooting section in the installation manual or contact technical support for further assistance.

Welcome to SHENZHEN NOBLE OPTO CO., LTD! With over 15 years of experience, we specialize in manufacturing high-quality traffic signal products. Owning our factory allows us to provide not only professional products and services but also the best prices in the market.

Please take a look at our product catalog, and feel free to reach out if you need any products or further information. We are here to assist you!

Related Products

Get in Touch with us

Fill out more information, We will get back to you within 24 hours.

Factory Address

Mingjinhai Industry Park, Tangtou Road,Shiyan Town, Bao'an District

Email

sales20@nobleled.com

Contact Us

Telephone : +86(755)27651483

Business Phone : +8619130389983

Work Time :08:00-18:00(Beijing time)